Updates on:

  • charge controller tests - next steps

  • procurement of EFOY

  • Solar panels and mounting

  • Overall progress toward deliverables.

  • DAS updates.

 Discussion topics

Item

Presenter

Notes

Item

Presenter

Notes

DAS Training

Gizem

  • March 11-12

Charge Controller Testing

Chad/Chris

Mitchell is working on the analysis. Delayed due to funding furlough, and some debugging. Debugging is fixed, shoot for mid-March completion. Pick up during March meeting, then schedule the ferrite bead test.

EFOY

Chad

PR approved, waiting for actual PO and procurement. Will put one on Mt. Saint Helens and will use the other for the DAS (below). The EFOY doesn’t power the DAS, it charges the battery bank, then use a DC to AC inverter to power the DAS. Basically are building a UPS because the power output from the inverters are stable. Will also build in an LVD and can have a back-up generator.

Solar Panels/Mounting (need to collaborate with Infrastructure Group)

Chad

Standard NOTA solar panel (~1800 stations use this) has a custom frame set-up (not COTS), ordered from one vendor (SolarFlexion). This has been discontinued. Need new solution with standard mounts, cable glands, still tamper resistant, etc.

Chad has been working with SolarFlexion to find a 100W panel slightly the same size. Need new tamper proof solution (torx bolts are too easy to come by these days, and aluminum is very easy to cut through). Working on solution to retrofit existing stations (so new panels can use existing mounting system and maintain tamper-resistant characteristics).

SolarFlexion will send two new 100W panels plus mounting hardware so Chad can mock up the new build.

Progress toward deliverables

Chad

  • updating CAD drawings - Kirsten look for consultant to help with this

  • portable <1W system - will meet on Thursday

  • DAS power requirements still need to be documented.

DAS Updates

Gizem/Chad

  • Haven’t been able to build a simulation because don’t have Simulink license.

  • Continue working on EFOY power plan

Chad’s visit to the EPIC

Chad

  • Is thinking about coming during the week of Feb 24

 Action items

@Kirsten Arnell investigate options for CAD consultant
@Gizem Karslioglu continue to work on documenting DAS power requirements
@Chris Calvelage and @Mitchell M. will continue on data analysis for charge controller noise testing
@Chad Pyatt continue procuring EFOY and working on solar panel mounts/procurement with Solar Flexion

 Decisions

  1. For now, we are going to hold off on testing the Sunwise charge controllers due to lack of use in E-scope IS field deployments.