  • Station Close-Out Report
  • AC power runs from J-box to weather enclosure with AC/DC adaptor with resistor to 15VDC.
  • DC power runs to the grizzly enclosure via direct burial cable, entering the grizzly via 2" conduit.
  • GPS, Met and Cell are all mounted on an external pipe adjacent to the grizzly cooler.

Service Plan

Site Access

  • To get to the station there are scheduled daily flights from Juneau to Gustavus.

  • The station is located behind City Hall off of Shooting Star road, adjacent to a small local park.

Site Contact

  • Tom Williams - Town Administrator (907) 697-2451 (someone named Karen typically answers this line. Not sure if it's a cell phone or forwarded office line), or Sandi Marchbanks, mayor@gustavus-ak.gov, (907) 697-2273

Site Visits

  •  2021_06_17 Removal (J. Miner, J. Soderquist)

    USArray Station Removal Report Form V1.0

    STATION CODE: TA.R31K

    STATION LOCALE DESCRIPTION: Gustavus, AK

    STATION REMOVAL LOG DATE: 06/17/21

    STATION/SENSOR DOWN TIME (UTC): 17:58

    REMOVAL DESCRIPTION: Station cooler, equipment and Sensor removal

    ACTIONS TAKEN: Powered the station down after collecting a final screenshot. The site was in good condition.  The cutoff casing was capped with a 6" expansion end plug 9" bgs. The remaining hole was filled with local material.

    The cooler was adopted by a Gustavus resident. The batteries and all site debris were disposed of at the Gustavus waste facility for recycling. The power system was removed from the septic pump/lift station post.  The site has changed significantly since the reconnaissance and installation, the city fire department has removed dozens of trees and other vegetation adjacent to the station.

    CASING CONDITIONS: The casing was in good condition with no damage to the wellcap or conduit.  No evidence of frost jacking and but water was present in the casing up to the top of the sensor.

    SEISMOMETER REMOVAL: The seismometer was removed by 2 person and a scissor jack, hard pull to break the suction with the saturated sand.

    LAT/LONG OF SENSOR HOLE: 58.41333, -135.73981


    SENSOR ORIENTATION MEASUREMENTS:

    Measured with OCTANS Unit: 0.98 degrees (OCTANS bc: 5007005, warmed up for ~15 minutes)

    Original orientation: 0.12 degrees using OCTANS


    COMMENTS: The casing cutoff process took ~20 minutes and consumed 4 cutoff wheels.


    REMOVED:


    Q330 TagId – 3148; bc – 5010037  

    Baler 44 sn – 16248; bc – 5006332   

    STS5A sn – 130789; bc – 5015513

    VIE bc – 5009285

    QEP sn – 116898; bc – 5001326   

    infra SETRA sn – 4547915; bc – 5001225   

    infra NCPA sn – H110590229; bc – 5011245   

    Regulator Board sn – 46; bc – 5009646

    WXT5520 sn – H1010010; bc – 5012843

    RV50 sn – LT74540227021031; bc – 5018775

    ATT SIM bc - 5014559



    DAMAGE: None


    LEFT AT SITE: Cutoff casing below surface.


    VISITORS:


    J. Miner
    J. Soderquist

  •  2020_05_28 Service (Remote Service R. Bierma)

    USArray Station Service Report
    Form V1.0

    STATION CODE:
    TA.R31K

    STATION Locale Description:
    Gustavus, AK

    STATION SERVICE LOG DATE:
    20200528

    STATION/SENSOR DOWN TIME (UTC):

    station was power cycled during phone call  


    SERVICE DESCRIPTION:

    Remote Station checkup by local contact


    UPON ARRIVAL:  

    The station appeared to be in good condition.


    ACTIONS TAKEN: 

    A call was made to the Gustavus City Hall. The lady (name?) who answered the call was willing to go out and check on the station. She confirmed that the AC/DC convertor has the solid green light illuminated indicating power to station. She opened the cooler and switched to a Facetime call so that I could see the indicator lights. The Q330 and VIE lights all appeared normal. The RV50 cell modem signal and connection lights were alternating red blinks, almost as though it were rebooting. She power cycled the system by removing yellow and red ringed cables. Once plugged back in, the RV50 continued the same blink pattern and the station did not come back online. The local contact closed and locked up the cooler and offered to assist with future diagnostics if necessary.


    EQUIPMENT REMOVED:

    n/a

    EQUIPMENT INSTALLED:
    n/a


    COMMENTS:

    First FaceTime diagnostics call I've ever done, it's convenient.


    VISITOR:

    remote service by R. Bierma


    ON NEXT VISIT:

    Swap AT&T RV50 cell modem and SIM


    CHANGES AFFECT INSTRUMENT RESPONSE:

    n/a


  • 2018_09_25 Service (J. Theis, J. Miner)
  • 2016_09_12 Install (J. Miner, R. Bierma, M. Enders, J. Theis)

Station Health

PDFs

ANF Station Page

MesoWest

58.41333, -135.73981, Elev: 49ft


Permits

LandownerPermit ExpiresNotificationStipulations

Private-Gustavus City Hall (R31K)

Renewal Permit

Close-Out Release

11/01/2022Yes, ~ 1 week,

Sandi Marchbanks or Mike Taylor, mayor@gustavus-ak.gov, (907) 697-2273

None